Rebuilt front steps and railings
Our customer asked us to rebuild their front steps and railings. We duplicated what was there and studied up the railings for them to safely use them
Our customer asked us to rebuild their front steps and railings. We duplicated what was there and studied up the railings for them to safely use them
Our customer wanted a complete new bathroom minus the tub. We came in and got it done for them on time and within budget.
Our customer wanted to spruce up her front windows. Got new blinds installed and will be back to paint the rest of the room.
Installed a dryer vent for our customer today. Our customer was very happy to have a properly functioning vent!
Really transformed this one. A new roof, power washed everything else, stained the railings and painted decking. While we were there, we re-roofed the wishing well.
Our customer had several water damaged ceiling tiles from a previous leak. After the leak was fixed their electrician came in and wired in recessed lights. We came in and replaced all the ceiling tiles and painted a utility closet for them after fixing the sheet rock.
Our customer wanted to spruce up their bathroom with a new toilet, vanity, medicine cabinet, door and vanity light. Mid way through the project we discovered the entryway to their shower was rotten. We had the project done on time including the rebuild of the shower entryway.