We helped a customer finish a remodel in a half bath. New sheet rock, toilet and vanity.
We helped a customer finish a remodel in a half bath. New sheet rock, toilet and vanity.
Our customer wanted to spruce up her front windows. Got new blinds installed and will be back to paint the rest of the room.
Our customer need to replace all the sheet rock in their kitchen. The ceiling was water damaged and the walls had old panels glued onto them. We stripped it to the studs and had it done in no time!
Our customer asked us to rebuild their front steps and railings. We duplicated what was there and studied up the railings for them to safely use them
Really transformed this one. A new roof, power washed everything else, stained the railings and painted decking. While we were there, we re-roofed the wishing well.
Finished up this attic ladder installation in Long Valley. Homeowner was very happy not to have to carry the ladder up stairs to check their HVAC system.
Our customer had several water damaged ceiling tiles from a previous leak. After the leak was fixed their electrician came in and wired in recessed lights. We came in and replaced all the ceiling tiles and painted a utility closet for them after fixing the sheet rock.