Kitchen makeover
Our customer need to replace all the sheet rock in their kitchen. The ceiling was water damaged and the walls had old panels glued onto them. We stripped it to the studs and had it done in no time!
Our customer need to replace all the sheet rock in their kitchen. The ceiling was water damaged and the walls had old panels glued onto them. We stripped it to the studs and had it done in no time!
Really transformed this one. A new roof, power washed everything else, stained the railings and painted decking. While we were there, we re-roofed the wishing well.
Finished up this attic ladder installation in Long Valley. Homeowner was very happy not to have to carry the ladder up stairs to check their HVAC system.
Our customer wanted to spruce up her front windows. Got new blinds installed and will be back to paint the rest of the room.
Our customer wanted to spruce up their bathroom with a new toilet, vanity, medicine cabinet, door and vanity light. Mid way through the project we discovered the entryway to their shower was rotten. We had the project done on time including the rebuild of the shower entryway.
Our customer asked us to rebuild their front steps and railings. We duplicated what was there and studied up the railings for them to safely use them
We helped a customer finish a remodel in a half bath. New sheet rock, toilet and vanity.